Selection context

This brief organizes the inputs for evaluating electromagnetic flow meters in treated-water distribution networks. It does not identify a utility or claim a completed order.

Engineering task

Match the meter to liquid conductivity, pipe sizes, pressure class, flange standard, liner and electrode compatibility, grounding, installation conditions, and the control system.

Review approach

  • Confirm the water conductivity and chemical conditions before selecting electromagnetic technology.
  • Document each pipe size, flange and pressure standard, liner and electrode requirement, straight-run availability, and grounding method.
  • Review the current AM-EMF100 configuration and request the calibration, inspection, packing, and delivery documents required by the project.

Verification checklist

Confirm these items against the current datasheet, quotation, and project-specific documents before approval.

  • Liquid conductivity, temperature, chemistry, and solids content
  • Pipe schedule, diameter, flange, pressure class, lining, and electrode material
  • Grounding, full-pipe condition, straight runs, and available installation space
  • Power, output, communication, display, and accuracy requirements
  • Approved datasheet, calibration scope, inspection plan, packing, and delivery terms